Boeing Winnipeg Expands To The MAX

Boeing Canada Winnipeg is to increase its manufacturing site at Murray Park Road by 22 per cent in order to house new composites work for the 737 MAX. The building will be expanded by 150,000sq-ft, bringing a total of 665,000sq-ft of manufacturing space to be mainly used to construct the one-piece composite acoustic inner barrel on the newly designed engine nacelle inlet for the 737 MAX.

Hide comments

Comments

  • Allowed HTML tags: <em> <strong> <blockquote> <br> <p>

Plain text

  • No HTML tags allowed.
  • Web page addresses and e-mail addresses turn into links automatically.
  • Lines and paragraphs break automatically.
Publish